Topolobampo III

    The Federal Electricity Commission awarded the project to build the Transmission Network associated with the Combined Cycle of Topolobampo III.

     

    ACCIONA has been chosen by Mexico's Federal Electricity Commission (CFE) to build the Transmission Network associated with the Topolobampo III Combined Cycle. The turnkey project (EPC) is being led by ACCIONA Industrial, together with its subsidiaries in Mexico.

    The scope of ACCIONA Industrial's work on this project includes the design and construction of two transmission lines and two substations with voltages of 400 kV and 230 kV and a total length of 276 kilometres of high-voltage line. The project is located in the states of Sinaloa and Sonora, Mexico.

    The works include engineering activities, supply of equipment for lines and substations, civil works, electromechanical assembly and commissioning tests.

    General information

    Location
    Mexico
    Client
    CFE
    Infrastructure
    276 KM and 2 substations

    discover other flagship projects

    EMPALME POWER PLANT TRANSMISSION LINES

    Sonora, Mexico

    The Federal Electricity Commission (Comisión Federal De Electricidad or CFE in Spanish) awarded a contract to transport energy generated at Empalme II power plant to the Mexican states of Sonora and Sinaloa.

    TRANSMISSION LINES FOR EL CORTIJO WIND FARM

    Tamaulipas, Mexico

    Construction of transmission line for El Cortijo wind farm in Tamaulipas in north-east Mexico.

    Move up