Gas Natural Açu FSRU

    ACCIONA was selected in 2018 by Gas Natural Açu (GNA) for the construction of a Liquefied Natural Gas (LNG) Regasification Terminal at the Port of Açu, in São João da Barra, in the State of Rio de Janeiro, Brazil.

    The EPC project includes the connection and transport of natural gas from a Floating Storage and Regasification Unit (FSRU), with a capacity of 21 million m³/day, to the thermoelectric park installed in the development. 

    GENERAL INFORMATION

    Location
    Río de Janeiro, Brazil
    Type of contract
    Construction
    Completion date
    2020

    Image Gallery

    discover other flagship projects

    ADRIATIC LNG TERMINAL

    Veneto, Italy

    First offshore liquefied natural gas (LNG) terminal in the world.

    GBS-LNG STORAGE

    Madrid, Spain

    GBS infrastructure with storage capacity, bunkering, and medium-scale LNG process.